Client:
Quantity:
Size:
Application:
In this application, five Vortex Titan Maintenance Gates are installed between each holding bin and its corresponding Vortex Loading Spout. The nine remaining Titan Maintenance Gates are used in other areas of the facility. Vortex Titan Maintenance Gates are used in heavy-duty and/or abrasive material handling applications in the case of an upset condition, or if downstream maintenance is required.